Enerya Ereğli natural gas project approval and drawing – Konya, Türkiye

A quick note for firms preparing projects in the Enerya Ereğli area: Enerya Ereğli Gaz Dağıtım A.Ş. serves Konya and belongs to the Enerya group. How its specification is handled in GazPlan, the calculation limits and the approval steps are set out below. Going by the company name, its service area is Konya / Ereğli; confirm the district boundaries with the company.

Rules: common values (not verified)

Specification status

Specification status: not read. Calculations for Enerya Ereğli use a common profile, based on TS 7363 general rules, i.e. the limits that the specifications we have read (İGDAŞ, Samgaz, Kırgaz) have in common. The rules and this page will be updated when the company's specification is uploaded.

Calculation limits GazPlan uses for Enerya Ereğli projects

Service box → meter loss limit1 mbar
Meter → appliance loss limit0.8 mbar
Velocity limit (low pressure)6 m/s
Friction loss, steelformula at all flows (23.2·R·Q^1.82/D^4.82, R = 0.6)
Efficiency in appliance flow90% at 70 kW and above
Isometric angle30°

Profile source: values common to the İGDAŞ 2017, Samgaz 2019 and Kırgaz specifications (limits 1.0 / 0.8 / 1.8 mbar, velocity 6 m/s, ζ table); TS 7363. The value in the company's current specification is what counts for a project.

Are there other distribution companies in Konya?

The Enerya group

Other companies in the same group: Enerya Aksaray Gaz Dağıtım A.Ş., Enerya Antalya Gaz Dağıtım A.Ş., Enerya Aydın Gaz Dağıtım A.Ş., Enerya Denizli Gaz Dağıtım A.Ş., Enerya Erzincan Gaz Dağıtım A.Ş., Enerya Kapadokya Gaz Dağıtım A.Ş., Enerya Karaman Gaz Dağıtım A.Ş., Enerya Konya Gaz Dağıtım A.Ş.

Enerya Ereğli project application, step by step

  1. Survey: take measurements, list the appliances and note the flue and vent situation (a first survey can be done from photos).
  2. Project: choose Konya as the province in GazPlan and type Ereğli as the district; pipe sizes and pressure loss are worked out with the common profile.
  3. Review: check the calculation sheet, isometric drawing and title block against the layout the company asks for.
  4. Submission: upload the file to the channel the company accepts, signed in the required way.
  5. On site: installation, testing and gas opening according to the approved project.

Confirm the application channel, the document list and the current specification on the company website (enerya.com.tr). This page does not give processing times or application addresses; company-specific details are added only when they can be verified.

Related guides and calculators

If you have the current version of the Enerya Ereğli specification, please send it to [email protected]; we will review it and, where it fits, update the rules in the app. Open the app

Company and province data: GAZBİR distribution company list. For information only; the distribution company's current specification and procedure apply to projects.

Frequently asked questions

Where does Enerya Ereğli distribute natural gas?

According to the GAZBİR list, Enerya Ereğli Gaz Dağıtım A.Ş. serves Konya. Going by the company name, the area is Konya / Ereğli; confirm the boundaries with the company. Other distribution companies also operate in Konya, so check the district of the address.

Does GazPlan calculate with Enerya Ereğli rules?

Not yet: the specification has not been read. For this company the app uses the common profile, based on TS 7363 general rules, and warns that the rules have not been verified. The rules will be updated when the specification is uploaded.

Which limits are used to size pipes in the Enerya Ereğli area?

The common profile in GazPlan allows 1 mbar loss from the service box to the meter and 0.8 mbar from the meter to the appliance, with a velocity limit of 6 m/s at low pressure. These values have not been verified for this company; the company's current specification is what counts for a project.

How many days does project approval take in the Enerya Ereğli area?

We have no source for a company-specific time, so we do not quote a number of days. It depends on how many applications are in the queue, whether the project is complete the first time and how many corrections are needed. For current information, see enerya.com.tr.