GazPlan

Akmercan Mardin natural gas project approval and drawing – Mardin, Türkiye

Akmercan Mardin Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş. is the natural gas distributor for Mardin; on the GAZBİR list it is one of the Akmercan group companies. This page covers the calculation values GazPlan uses when you draw an indoor installation project in its area, where the company specification stands and the steps towards project approval.

Rules: common values (not verified)

The Akmercan Mardin specification

The Akmercan Mardin specification has not yet been uploaded to GazPlan and has not been read. The app therefore calculates with a common profile, based on TS 7363 general rules; any company-specific differences will be added, and this page updated, when the specification is uploaded.

Values of the common profile

Service box → meter loss limit1 mbar
Meter → appliance loss limit0.8 mbar
Velocity limit (low pressure)6 m/s
Friction loss, steelformula at all flows (23.2·R·Q^1.82/D^4.82, R = 0.6)
Efficiency in appliance flow90% at 70 kW and above
Isometric angle30°

Profile source: values common to the İGDAŞ 2017, Samgaz 2019 and Kırgaz specifications (limits 1.0 / 0.8 / 1.8 mbar, velocity 6 m/s, ζ table); TS 7363. The value in the company's current specification is what counts for a project.

Are there other distribution companies in Mardin?

  • Mardin: the only distribution company in the province according to the GAZBİR list.

The Akmercan group

Other companies in the same group: Akmercan Artvin Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş., Akmercan Batıkar Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş., Akmercan Delta Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş., Akmercan Gepa Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş., Akmercan Hakkari-Şırnak Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş., Akmercan Muğla Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş., Akmercan Sinop Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş., Akmercan Tunceli Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş., Akmercangaz Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş.

Steps to project approval

  1. The firm and the certified engineer preparing the project need to be authorised in the Akmercan Mardin area.
  2. Select Mardin in the app and Akmercan Mardin Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş. is chosen automatically.
  3. Once the drawing is finished, run the check to clear the specification warnings and export the sheets as PDF.
  4. Submit the file in the format the company requires; if it comes back, correct it and send it again as a new revision.
  5. Installation, leak-tightness test and gas opening appointment, following the approved project.

Ask the company, or the authorised firm you work with, about the application channel and the current document list. This page does not give processing times or application addresses; company-specific details are added only when they can be verified.

Related guides and calculators

If you have the current version of the Akmercan Mardin specification, please send it to [email protected]; we will review it and, where it fits, update the rules in the app. Open the app

Company and province data: GAZBİR distribution company list. For information only; the distribution company's current specification and procedure apply to projects.

Frequently asked questions

Which provinces does Akmercan Mardin serve?

According to the GAZBİR list, Akmercan Mardin Doğal Gaz Dağıtım Sanayi ve Ticaret A.Ş. serves Mardin.

Is the Akmercan Mardin specification available in GazPlan?

Not yet: the specification has not been read. For this company the app uses the common profile, based on TS 7363 general rules, and warns that the rules have not been verified. The rules will be updated when the specification is uploaded.

What pressure loss limits apply to Akmercan Mardin projects?

The common profile in GazPlan allows 1 mbar loss from the service box to the meter and 0.8 mbar from the meter to the appliance, with a velocity limit of 6 m/s at low pressure. These values have not been verified for this company; the company's current specification is what counts for a project.

How long does Akmercan Mardin project approval take?

We have no source for a company-specific time, so we do not quote a number of days. It depends on how many applications are in the queue, whether the project is complete the first time and how many corrections are needed. For current information, ask the company or your authorised installation firm.